BConstruction & engineeringBuilt for

Website Design for Construction and Engineering Firms

A construction or engineering firm has a great deal to show: projects, divisions, capabilities, people, safety and standards. The website has to arrange it so a first-time visitor finds their way at once. Berriton Group designs websites for construction companies, engineering firms, contractors and builders who need a site that presents their capability, project record and divisional structure clearly. A site of this kind is drawn under Berriton Group’s usual discipline: a written scope, a fixed fee, six phases you approve.

What a construction or engineering website has to arrange

A project record, arranged by sector or discipline, with room for the drawings, the photographs and the written matter that go with each entry.

Capability statements, set out plainly, so a procurement reader can tell at once what the firm undertakes and what it does not.

Division and business-unit sections, each a proper address of its own, planned so that the whole still reads as one firm.

Standards, accreditations, safety and the technical documentation a serious enquirer expects before they write.

How we draw yours

Discovery first, to learn the firm and the shape of its work. The sitemap is settled on paper during Architecture, and agreed with you, so a large organisation reads clearly.

The scope and one fixed fee are agreed before any work is done. Six phases follow, each approved by you. Picture and document weight are considered during Architecture, so a large portfolio is served without the page suffering.

Written down first

Our part, and yours

Our part

  1. iA written scope and one fixed fee, agreed before any work is done.
  2. iiA sitemap drawn on paper: projects, capabilities, divisions and the enquiry path, all settled with you before any page is designed.
  3. iiiA design direction shown to you before any page is built.
  4. ivA responsive, fast website that carries a large body of work without the page suffering, built exactly to the drawing you approved.
  5. vA review point at every one of the six phases, so progress is always in view.
  6. viThe finished site, the files, the access and the domain, with the documentation to run them.

Your part

  1. iYour content. How ready it is shapes the schedule.
  2. iiYour brand rules, and the systems and people the site has to work alongside.
  3. iiiA decision at each of the six approvals. No phase opens until the one before it is approved.

Every commission follows the same six phases. See the process in full

Questions

Questions we are often asked

  1. i

    Can a division or business unit have its own section within the main site?

    Yes. Where one part of the firm has outgrown a single page, we give that division or business unit a proper address of its own, planned so that it still belongs to the whole.

  2. ii

    Can the site carry a large project record without the page suffering?

    Yes. Picture and document weight are considered during Architecture, and the finished site is built responsive and fast, and tested against the plan you approved before it opens.

  3. iii

    Do we see the structure of a large site before any page is designed?

    Yes. The sitemap is settled on paper during Architecture and agreed with you, so a first-time visitor finds their way at once.

The next step

Shall we draw yours?

Describe your organisation and what its website should do for it. A brief is not required, and a written proposal reaches you before anything is begun.